For large business consumers please see rates below as mandatory by the Ontario Energy Board.


Electricity Rates Effective May 1st, 2016
 

General Service less than 50 kW

General Service greater than 50 kW General Service > 50 kW (Interval) Unmetered Scattered Load Street Lighting 
Delivery * Demand based on peak kW between 07:00 and 19:00‚ hours on non-holiday‚ weekdays‚ Per Connection
Service Charge $38.44 /month $274.74 /month $274.74 /month $20.68/month $7.66 /month /connection
           
Distribution Volumetric Rate

$0.01115 / kWh

$2.1681 /kW $2.1681 /kW $0.0062/kWh $29.9406/kW
Fixed Rate Riders $0.79 / month - - - -
Variable Rate Riders ($0.0037) /kWh $0.9507 /kW $0.9507 /kW ($0.0045) /kWh ($1.4118) /kW
Retail Transmission Rate- Network $0.0066 /kWh $2.6811 /kW $2.8977 /kW  7-7* $0.0066 /kWh $2.0216 /kW
Retail Transmission Rate - Connection $0.0015 /kWh $0.5207 /kW $1.2524 /kW $0.0015/kWh $0.4026 /kW
   
Regulatory Charges  
Standard Supply Service Admin. Charge $0.25 $0.25 $0.25 $0.25 $0.25
Wholesale Market Service Rate $0.0036 /kWh $0.0036 /kWh $0.0036 /kWh $0.0036 /kWh $0.0036 /kWh
Rural Rate Protection Charge $0.0013 /kWh $0.0013 /kWh $0.0013 /kWh $0.0013/kWh $0.0013/kWh
Ontario Electricity Support Program Charge  $0.0011 /kWh  $0.0011 /kWh  $0.0011 /kWh $0.0011 /kWh

$0.0011 /kWh

Electricity Commodity  

OFF PEAK

(7pm - 7am)

Weekends & STAT HOLIDAYS are ALWAYS OFF-Peak

8.7¢/kWh These customer classes pay weighted average hourly price or contracted price from a retailer

 MID PEAK (7am -11am & 5pm - 7pm)

13.2¢/kWh

ON PEAK

(11am - 5pm)

18.0¢/kWh
NOTE:  Rates are set by the Ontario Energy Board (OEB) and are subject to change every six months(May 1 & November 1).

Loss Factors  
Total Loss Factor - Secondary Metered Customer < 5,000 kW  1.0463
Total Loss Factor - Secondary Metered Customer > 5,000 kW 1.0156
Total Loss Factor - Primary Metered Customer < 5,000 kW 1.0358
Total Loss Factor - Primary Metered Customer > 5,000 kW 1.0055
   
Water Rates Effective January 1st, 2017
Water Wastewater
Meter Size (inches) Fixed Charge Meter Size (inches) Fixed Charge
up to 3/4 $23.11 up to 3/4 $25.55
1 $32.37 1 $35.76
1 1/2 $41.61 1 1/2 $45.98
2 $67.04 2 $73.02
3 $254.29 3 $280.99
4 $323.64 4 $357.63
6 $485.46 6 $536.44
8 $670.40 8 $740.79
10 $924.68 10 $1021.80
       
Variable Rate $1.3471 m3 Variable Rate $0.9839 m3
 
 
 
SERVICE CHARGES
Effective May 1, 2014
As approved by the Ontario Energy Board
 

Monthly distribution and electricity rates will be shown on a Rates Card to be provided with customer bills. The Ontario Energy Board also approved the following charges:

Specific Service Charges
 
Customer Administration
 
Arrears Certificate - Hydro $15.00
Arrears Certificate - Water (no HST) $15.00
Statement of Account $15.00
Pulling Post Dated Cheques $15.00
Duplicate Invoices for Previous Billing $15.00
Easement Letter $15.00
Account History $15.00
Credit Reference/Credit Check (plus credit agency costs) $15.00
Returned Cheque Charge $15.00
Charge to Certify Cheque $15.00
Account set up charge/change of occupancy charge (plus credit agency if applicable) $30.00
Special Meter Reads $30.00
Meter dispute charge plus Measurement Canada fees (if meter found correct) $30.00
 
Non-Payment of Account
 
Late Payment - per month % 1.50
Late Payment - per annum % 19.56
Collection of Account Charge - No Disconnection $30.00
Disconnect/Reconnect Charges at Meter - During Regular Hours $65.00
Disconnect/Reconnect Charges at Meter - After Regular Hours $185.00
Disconnect/Reconnect Charges at Pole - During Regular Hours $185.00
Disconnect/Reconnect Charges at Pole - After Regular Hours $415.00
 
Temporary Services
 
Temporary Service‚  Install & Remove - Overhead - No transformer $500.00
Temporary Service Install & Remove - Underground - No Transformer $300.00
Temporary Service Install & Remove - Overhead - with Transformer $1000.00
 
Other Services
 
Service Call - Customer-owned Equipment - During Regular Hours $30.00
Service Call - Customer-owned Equipment - After Regular Hours $165.00
Install/Remove Load Control Device - During Regular Hours $65.00
Install/Remove Load Control Device - After Regular Hours $185.00
Specific Charge for Access to the Power Poles - per pole/year $22.35
Specific Charge for Bell Canada Access to the Power Poles - per pole/year $18.36

NOTE:  Specific Charge for Bell Canada Access to the Power Poles is valid only until the existing joint-use ageement is terminated.  

**ALL above charges are subject to HST (exception water arrears certificate)